Duke Energy queue ID FC100009

Queue request FC100009 was listed in the Duke Energy interconnection queue at the end of 2025 as a 199 MW battery project in Pasco County, FL, according to Berkeley Lab’s queue data file. The filing names Anclote Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 31, 2029.

Queue IDFC100009
Project nameNot reported
Status (as published)Active
SubstationAnclote Substation
Point of interconnectionAnclote Substation 230 kV
CountyPasco
StateFL
Voltage230 kV
Capacity199 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2029-10-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Anclote Substation substation: 7 requests in the Duke Energy queue, 3 active totaling 219 MW.

Queue IDProjectMWResourceStatus
53Not reported10GasOperational
55Not reported10GasOperational
109Not reported1,400GasWithdrawn
110Not reported1,400GasWithdrawn
52Not reported9GasWithdrawn
54Not reported9GasWithdrawn

Pasco, FL: 15 requests in the Duke Energy queue, 7 active totaling 1,361.6 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Florida
DeveloperDuke Energy Florida, LLC
ClusterCluster: 2024 Annual DEF FERC Cluster; Cluster Sub Group: Coastal
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Pending
Study phase (as the queue printed it)Interconnection Agreement - Pending
Queue date2024-12-05

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first