Duke Energy queue ID FC100000

Queue request FC100000 was listed in the Duke Energy interconnection queue at the end of 2025 as a 13.1 MW project in Pasco County, FL, according to Berkeley Lab’s queue data file. The filing names Hudson Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of April 1, 2026.

Queue IDFC100000
Project nameNot reported
Status (as published)Active
SubstationHudson Substation
Point of interconnectionHudson Substation 115 kV
CountyPasco
StateFL
Voltage115 kV
Capacity13.1 MW
Resource (as published)Other
Resource categoryOther (normalized for filtering)
Proposed online date2026-04-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Hudson Substation substation: 6 requests in the Duke Energy queue, 2 active totaling 493.1 MW.

Queue IDProjectMWResourceStatus
5Not reported480GasOperational
93Not reported650GasWithdrawn
129Not reported400OtherWithdrawn
77Not reported345GasWithdrawn
116Not reported220OtherWithdrawn

Pasco, FL: 15 requests in the Duke Energy queue, 7 active totaling 1,361.6 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Florida
DeveloperMasked
ClusterCluster: 2024 Annual DEF FERC Cluster; Cluster Sub Group: Coastal
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Facility Study
Queue date2024-12-04

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.