Queue request 137 was listed in the Duke Energy interconnection queue at the end of 2025 as a 575 MW gas project in Pasco County, FL, according to Berkeley Lab’s queue data file. The filing names Hudson N Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 1, 2020.

Queue ID137
Project nameNot reported
Status (as published)Active
SubstationHudson N Substation
Point of interconnectionHudson N Substation
CountyPasco
StateFL
VoltageNot reported
Capacity575 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2020-06-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Pasco, FL: 15 requests in the Duke Energy queue, 7 active totaling 1,361.6 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Florida
DeveloperSeminole Electric Cooperative, Inc.
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Construction
Queue date2015-11-10

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first