Substation Scout

Jackson, NC interconnection queue

3 active projects totaling 13.2 MW in the Duke Energy queue.

3active projects
13.2active MW
3total filed
Queue IDProjectkVMWResourceStatus
957051 Not reported 161 9.9 Hydro Active
899609 Not reported n/r 1.8 Hydro Active
899793 Not reported n/r 1.5 Hydro Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first