Duke Energy request 899793

Duke Energy queue ID 899793

Queue request 899793 was listed in the Duke Energy interconnection queue at the end of 2025 as a 1.5 MW hydro project in Jackson County, NC, according to Berkeley Lab’s queue data file. The filing names EAST FORK as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of March 30, 2026.

Queue ID899793
Project nameNot reported
Status (as published)Active
SubstationEAST FORK
Point of interconnectionEAST FORK
CountyJackson
StateNC
VoltageNot reported
Capacity1.5 MW
Resource (as published)Hydro
Resource categoryHydro (normalized for filtering)
Proposed online date2026-03-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Jackson, NC: 3 requests in the Duke Energy queue, 3 active totaling 13.2 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Carolinas
Cluster2023 DISIS
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Engineering Design - In Progress
Queue date2023-06-28

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.