Queue request 957051 was listed in the Duke Energy interconnection queue at the end of 2025 as a 9.9 MW hydro project in Jackson County, NC, according to Berkeley Lab’s queue data file. The filing names THORPE HYDRO Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”.

Queue ID957051
Project nameNot reported
Status (as published)Active
SubstationTHORPE HYDRO Substation
Point of interconnectionTHORPE HYDRO Substation 161 kV
CountyJackson
StateNC
Voltage161 kV
Capacity9.9 MW
Resource (as published)Hydro
Resource categoryHydro (normalized for filtering)
Proposed online dateNot reported
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Jackson, NC: 3 requests in the Duke Energy queue, 3 active totaling 13.2 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Carolinas
Cluster2024 DISIS
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Phase 3 Cluster Study - Study Complete
Queue date2024-06-27

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first