Duke Energy request 899609
Duke Energy queue ID 899609
Queue request 899609 was listed in the Duke Energy interconnection queue at the end of 2025 as a 1.8 MW hydro project in Jackson County, NC, according to Berkeley Lab’s queue data file. The filing names BEAR CREEK HYDRO as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of January 15, 2026.
| Queue ID | 899609 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | BEAR CREEK HYDRO |
| Point of interconnection | BEAR CREEK HYDRO |
| County | Jackson |
| State | NC |
| Voltage | Not reported |
| Capacity | 1.8 MW |
| Resource (as published) | Hydro |
| Resource category | Hydro (normalized for filtering) |
| Proposed online date | 2026-01-15 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Jackson, NC: 3 requests in the Duke Energy queue, 3 active totaling 13.2 MW.
Tracked changes
Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Duke Energy Carolinas |
|---|---|
| Cluster | 2023 DISIS |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Executed |
| Study phase (as the queue printed it) | Engineering Design - In Progress |
| Queue date | 2023-06-28 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.