Alachua, FL interconnection queue
6 active projects totaling 448.2 MW in the Duke Energy queue, plus 18 with terminal status (shown grayed).
6active projects
448.2active MW
24total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 140 | Not reported | n/r | 75 | Solar | Withdrawn |
| 201 | Not reported | n/r | 75 | Solar | Withdrawn |
| 147A | Not reported | n/r | 74.9 | Solar | Withdrawn |
| 184 | Not reported | n/r | 74.9 | Solar | Withdrawn |
| 189C | Not reported | n/r | 74.9 | Solar | Withdrawn |
| 190A | Not reported | n/r | 74.9 | Solar | Operational |
| 215 | Not reported | n/r | 74.9 | Solar | Withdrawn |
| 216 | Not reported | n/r | 74.9 | Solar | Withdrawn |
| 231 | Not reported | n/r | 74.9 | Solar | Withdrawn |
| 267 | Not reported | n/r | 74.9 | Solar | Withdrawn |
| 268 | Not reported | n/r | 74.9 | Solar | Withdrawn |
| 276 | Not reported | n/r | 74.9 | Solar | Withdrawn |
| 277 | Not reported | n/r | 74.9 | Solar | Operational |
| 278 | Not reported | n/r | 74.9 | Solar | Withdrawn |
| 289 | Not reported | n/r | 74.9 | Solar | Withdrawn |
| 293 | Not reported | n/r | 74.9 | Solar | Suspended |
| FC100010 | Not reported | 230 | 74.9 | Solar | Withdrawn |
| FC100011 | Not reported | 230 | 74.9 | Solar | Withdrawn |
| 200 | Not reported | n/r | 74.5 | Solar | Withdrawn |
| 241 | Not reported | n/r | 74.5 | Solar | Withdrawn |
| 284 | Not reported | n/r | 74.5 | Solar | Active |
| 311 | Not reported | n/r | 74.5 | Solar | Suspended |
| 312 | Not reported | n/r | 74.5 | Solar | Suspended |
| 194C | Not reported | n/r | 40 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.