Alachua, FL interconnection queue

6 active projects totaling 448.2 MW in the Duke Energy queue, plus 18 with terminal status (shown grayed).

6active projects
448.2active MW
24total filed
Queue IDProjectkVMWResourceStatus
140 Not reported n/r 75 Solar Withdrawn
201 Not reported n/r 75 Solar Withdrawn
147A Not reported n/r 74.9 Solar Withdrawn
184 Not reported n/r 74.9 Solar Withdrawn
189C Not reported n/r 74.9 Solar Withdrawn
190A Not reported n/r 74.9 Solar Operational
215 Not reported n/r 74.9 Solar Withdrawn
216 Not reported n/r 74.9 Solar Withdrawn
231 Not reported n/r 74.9 Solar Withdrawn
267 Not reported n/r 74.9 Solar Withdrawn
268 Not reported n/r 74.9 Solar Withdrawn
276 Not reported n/r 74.9 Solar Withdrawn
277 Not reported n/r 74.9 Solar Operational
278 Not reported n/r 74.9 Solar Withdrawn
289 Not reported n/r 74.9 Solar Withdrawn
293 Not reported n/r 74.9 Solar Suspended
FC100010 Not reported 230 74.9 Solar Withdrawn
FC100011 Not reported 230 74.9 Solar Withdrawn
200 Not reported n/r 74.5 Solar Withdrawn
241 Not reported n/r 74.5 Solar Withdrawn
284 Not reported n/r 74.5 Solar Active
311 Not reported n/r 74.5 Solar Suspended
312 Not reported n/r 74.5 Solar Suspended
194C Not reported n/r 40 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.

Site Scanner