Duke Energy request 312
Duke Energy queue ID 312
Queue request 312 was listed in the Duke Energy interconnection queue at the end of 2025 as a 74.5 MW solar project in Alachua County, FL, according to Berkeley Lab’s queue data file. The filing names Bronson - Newberry as its point of interconnection. Its status as of December 31, 2025 was “Suspended”, with a proposed online date of June 15, 2026.
| Queue ID | 312 |
|---|---|
| Project name | Not reported |
| Status (as published) | Suspended |
| Substation | Bronson - Newberry |
| Point of interconnection | Bronson - Newberry |
| County | Alachua |
| State | FL |
| Voltage | Not reported |
| Capacity | 74.5 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Proposed online date | 2026-06-15 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Bronson - Newberry substation: 2 requests in the Duke Energy queue, 2 active totaling 149 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 311 | Not reported | 74.5 | Solar | Suspended |
Alachua, FL: 24 requests in the Duke Energy queue, 6 active totaling 448.2 MW.
Tracked changes
Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Duke Energy Florida |
|---|---|
| Developer | Florida Renewable Partners, LLC |
| Interconnection service | NRIS/ERIS |
| Project type | Generation |
| Queue date | 2022-04-22 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.