Queue request 311 was listed in the Duke Energy interconnection queue at the end of 2025 as a 74.5 MW solar project in Alachua County, FL, according to Berkeley Lab’s queue data file. The filing names Bronson - Newberry as its point of interconnection. Its status as of December 31, 2025 was “Suspended”, with a proposed online date of December 31, 2025.

Queue ID311
Project nameNot reported
Status (as published)Suspended
SubstationBronson - Newberry
Point of interconnectionBronson - Newberry
CountyAlachua
StateFL
VoltageNot reported
Capacity74.5 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2025-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Bronson - Newberry substation: 2 requests in the Duke Energy queue, 2 active totaling 149 MW.

Queue IDProjectMWResourceStatus
312Not reported74.5SolarSuspended

Alachua, FL: 24 requests in the Duke Energy queue, 6 active totaling 448.2 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Florida
DeveloperFlorida Renewable Partners, LLC
Interconnection serviceNRIS/ERIS
Project typeGeneration
Queue date2022-05-03

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.