Duke Energy request 293

Duke Energy queue ID 293

Queue request 293 was listed in the Duke Energy interconnection queue at the end of 2025 as a 74.9 MW solar project in Alachua County, FL, according to Berkeley Lab’s queue data file. The filing names Highsprings to Hull Road as its point of interconnection. Its status as of December 31, 2025 was “Suspended”, with a proposed online date of September 30, 2024.

Queue ID293
Project nameNot reported
Status (as published)Suspended
SubstationHighsprings to Hull Road
Point of interconnectionHighsprings to Hull Road
CountyAlachua
StateFL
VoltageNot reported
Capacity74.9 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2024-09-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Alachua, FL: 24 requests in the Duke Energy queue, 6 active totaling 448.2 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Florida
DeveloperPleasant Solar, LLC
Interconnection serviceNRIS/ERIS
Project typeGeneration
Queue date2021-08-06

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.