Substation Scout

Grizzly Substation substation interconnection queue

0 active projects totalling 0 MW in the BPA queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
G10 1100MW Grizzly 500 1,100 Gas WITHDRAWN
G1061 Not reported n/r 300 Solar WITHDRAWN
G1059 Not reported n/r 100 Wind WITHDRAWN
G1060 Not reported n/r 100 Wind WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.