Jefferson, OR interconnection queue

0 active projects totalling 0 MW in the BPA queue, plus 11 with terminal status (shown greyed).

0active projects
0active MW
11total filed
Queue IDProjectkVMWResourceStatus
G10 1100MW Grizzly 500 1,100 Gas WITHDRAWN
G0583 Not reported 500 1,000 Solar WITHDRAWN
G0758 Not reported 500 600 Solar WITHDRAWN
G1061 Not reported n/r 300 Solar WITHDRAWN
G0579 Not reported n/r 250 Solar WITHDRAWN
G0573 Not reported 230 200 Solar WITHDRAWN
G0839 Not reported 230 150 Solar WITHDRAWN
G1059 Not reported n/r 100 Wind WITHDRAWN
G1060 Not reported n/r 100 Wind WITHDRAWN
G0690 Not reported 69 20 Solar WITHDRAWN
G0726 Not reported 69 20 Solar WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.