Connell Tap on the Benton-Scooteney line. substation interconnection queue

3 active projects totalling 30 MW in the BPA queue.

3active projects
30active MW
3total filed
Queue IDProjectkVMWResourceStatus
G0689 Not reported n/r 10 Solar STUDY
G1004 Not reported n/r 10 Solar STUDY
G1079 Not reported n/r 10 Battery STUDY

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.