Franklin, WA interconnection queue

5 active projects totalling 56.5 MW in the BPA queue, plus 3 with terminal status (shown greyed).

5active projects
56.5active MW
8total filed
Queue IDProjectkVMWResourceStatus
G0564 Not reported 115 80 Solar WITHDRAWN
G70-01 01 37MW Connell n/r 37 Gas WITHDRAWN
G70-02 02 37MW Franklin PUD,Franklin Riverview n/r 37 Gas WITHDRAWN
G1099 Not reported n/r 24.5 Battery RECEIVED
G0689 Not reported n/r 10 Solar STUDY
G1004 Not reported n/r 10 Solar STUDY
G1079 Not reported n/r 10 Battery STUDY
G0441 Esquatzel Project n/r 2 Hydro ENERGIZED

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.