Coyote Springs 2

BPA queue ID G0616

Queue IDG0616
Project nameCoyote Springs 2
Status (as published)ENERGIZED
SubstationCoyote Springs Switchyard
Point of interconnectionCoyote Springs Switchyard
CountyMorrow
StateOR
VoltageNot reported
Capacity42 MW
Resource (as published)Natural Gas/Combined Cycle
Resource categoryGas (normalised for filtering)
Target commercial operation2019-06-24
Source datasetbpa-generation

Tracked changes

No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →

Additional filed fields

RequestorAvista Corporation
Connection TypeGI
Interconnection TypeERIS
PoiCoyote Springs Switchyard
Generator TypeCombined Cycle
Fuel SourceNatural Gas
Nameplate Mw Total42
Max Summer Mw42
Max Winter Mw42
Reason Not Completed.
CommentsIncrease of 42 MW (from 280 MW to 322 MW) of available capacity to the existing Coyote Springs 2 project.

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.