Substation Scout

Yakima, WA interconnection queue

10 active projects totalling 3,060 MW in the BPA queue, plus 11 with terminal status (shown greyed).

10active projects
3,060active MW
21total filed
Queue IDProjectkVMWResourceStatus
G1009 Not reported 230 600 Hydro WITHDRAWN
G1087 Not reported 500 500 Solar RECEIVED
G1037 Not reported n/r 400 Solar STUDY
G1038 Not reported n/r 400 Solar STUDY
G1080 Not reported 500 400 Solar RECEIVED
G1081 Not reported 500 400 Solar RECEIVED
G1082 Not reported 500 400 Solar RECEIVED
G1083 Not reported 500 400 Solar RECEIVED
G0252 Not reported 500 350 Wind WITHDRAWN
G0271 Not reported 230 300 Wind WITHDRAWN
G0272 Not reported 230 300 Wind WITHDRAWN
G0817 Not reported n/r 215 Solar WITHDRAWN
G0604 Not reported n/r 115 Solar WITHDRAWN
G0667 Not reported 115 100 Solar WITHDRAWN
G0842 Not reported 115 90 Solar WITHDRAWN
G0562 Not reported 115 80 Solar WITHDRAWN
G0563 Not reported 115 80 Solar WITHDRAWN
G0578 Goose Prairie Solar 115 80 Solar ENERGIZED
G0596 Ostrea Solar Project 115 80 Solar ENERGIZED
G1010 Not reported 230 70 Solar WITHDRAWN
G1076 Not reported 115 0 Battery STUDY

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.