Hood River, OR interconnection queue

1 active project totalling 234 MW in the BPA queue, plus 2 with terminal status (shown greyed).

1active projects
234active MW
3total filed
Queue IDProjectkVMWResourceStatus
G1036 Not reported 230 234 Wind STUDY
G0554 Not reported 230 148 Wind WITHDRAWN
G0553 Not reported 230 70 Wind WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.