Substation Scout

Harney, OR interconnection queue

5 active projects totalling 95 MW in the BPA queue, plus 15 with terminal status (shown greyed).

5active projects
95active MW
20total filed
Queue IDProjectkVMWResourceStatus
G1049 Not reported 115 650 Battery WITHDRAWN
G0304 Not reported n/r 416 Wind WITHDRAWN
G0835 Not reported n/r 120 Solar WITHDRAWN
G0301 Not reported n/r 104 Wind WITHDRAWN
G0302 Not reported n/r 104 Wind WITHDRAWN
G0303 Not reported n/r 104 Wind WITHDRAWN
G0357 Not reported n/r 104 Wind WITHDRAWN
G0381 Not reported n/r 103 Wind WITHDRAWN
G0346 Not reported 115 76 Wind WITHDRAWN
G0347 Not reported 115 76 Wind WITHDRAWN
G0592 Not reported n/r 40 Solar WITHDRAWN
G0520 NewSun Starvation Solar Project 115 20 Solar ENERGIZED
G0522 NewSun Riley Project 115 20 Solar ENERGIZED
G0525 Not reported 115 20 Solar WITHDRAWN
G0536 Not reported 115 20 Solar WITHDRAWN
G0537 Not reported 115 20 Solar STUDY
G0538 Not reported 115 20 Solar WITHDRAWN
G1069 Not reported 115 20 Solar STUDY
G0722 Not reported 115 15 Solar STUDY
G0331 Not reported 115 8 Wind WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.