Cholla substation interconnection queue

7 active projects totaling 2,408 MW in the APS queue, plus 8 with terminal status (shown grayed).

15 APS queue filings name Cholla as the point of interconnection, all in AZ.

7active projects
2,408active MW
15total filed
Queue IDProjectkVMWResourceStatus
Q402 Not reported 500 750 Hybrid Active
Q403 Not reported 500 750 Hybrid Withdrawn
Q281 Not reported 345 665 Wind Withdrawn
Q387 Not reported 500 588 Hybrid Active
Q351 Not reported 500 500 Hybrid Withdrawn
Q428 Not reported 500 500 Hybrid Withdrawn
Q544 Not reported 345 500 Other Withdrawn
Q344 Not reported n/r 400 Solar Withdrawn
Q347 Not reported 500 345 Wind Active
Q203 Not reported 345 250 Wind Withdrawn
Q333 Not reported 230 200 Hybrid Active
Q421 Not reported 500 200 Hybrid Withdrawn
Q422 Not reported 500 200 Battery Active
Q424 Not reported 500 200 Hybrid Active
Q423 Not reported 500 125 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with APS before relying on these figures.