APS request Q347
APS queue ID Q347
Queue request Q347 was listed in the APS interconnection queue at the end of 2025 as a 345 MW wind project in Navajo County, AZ, according to Berkeley Lab’s queue data file. The filing names Cholla as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 1, 2024.
| Queue ID | Q347 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Cholla |
| Point of interconnection | Cholla 500kV |
| County | Navajo |
| State | AZ |
| Voltage | 500 kV |
| Capacity | 345 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Proposed online date | 2024-12-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Cholla substation: 15 requests in the APS queue, 7 active totaling 2,408 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| Q402 | Not reported | 750 | Hybrid | Active |
| Q387 | Not reported | 588 | Hybrid | Active |
| Q333 | Not reported | 200 | Hybrid | Active |
| Q422 | Not reported | 200 | Battery | Active |
| Q424 | Not reported | 200 | Hybrid | Active |
| Q423 | Not reported | 125 | Battery | Active |
| Q403 | Not reported | 750 | Hybrid | Withdrawn |
| Q281 | Not reported | 665 | Wind | Withdrawn |
| Q351 | Not reported | 500 | Hybrid | Withdrawn |
| Q428 | Not reported | 500 | Hybrid | Withdrawn |
| Q544 | Not reported | 500 | Other | Withdrawn |
| Q344 | Not reported | 400 | Solar | Withdrawn |
2 more on the substation page.
Navajo, AZ: 65 requests in the APS queue, 26 active totaling 7,906.4 MW.
Tracked changes
Not tracked. APS rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Arizona Public Service |
|---|---|
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Cluster Study |
| Study phase (as the queue printed it) | Transitional Cluster: Phase 3 (Re-Study) |
| Queue date | 2020-09-04 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.