Queue request Q402 was listed in the APS interconnection queue at the end of 2025 as a 750 MW hybrid project in Navajo County, AZ, according to Berkeley Lab’s queue data file. The filing names Cholla as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of January 8, 2025.

Queue IDQ402
Project nameNot reported
Status (as published)Active
SubstationCholla
Point of interconnectionCholla 500kV
CountyNavajo
StateAZ
Voltage500 kV
Capacity750 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2025-01-08
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Cholla substation: 15 requests in the APS queue, 7 active totaling 2,408 MW.

Queue IDProjectMWResourceStatus
Q387Not reported588HybridActive
Q347Not reported345WindActive
Q333Not reported200HybridActive
Q422Not reported200BatteryActive
Q424Not reported200HybridActive
Q423Not reported125BatteryActive
Q403Not reported750HybridWithdrawn
Q281Not reported665WindWithdrawn
Q351Not reported500HybridWithdrawn
Q428Not reported500HybridWithdrawn
Q544Not reported500OtherWithdrawn
Q344Not reported400SolarWithdrawn

2 more on the substation page.

Navajo, AZ: 65 requests in the APS queue, 26 active totaling 7,906.4 MW.

Tracked changes

Not tracked. APS rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityArizona Public Service
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Transitional Cluster: Phase 3 (Re-Study)
Queue date2021-09-28
Components (hybrid)Solar 750 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first