Queue request 600 was listed in the TVA interconnection queue at the end of 2025 as a 200 MW battery project in Clay County, MS, according to Berkeley Lab’s queue data file. The filing names West Point, MS 500-kV Substation (161-kV) as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of August 1, 2026.

Queue ID600
Project nameNot reported
Status (as published)Active
SubstationWest Point, MS 500-kV Substation (161-kV)
Point of interconnectionWest Point, MS 500-kV Substation (161-kV)
CountyClay
StateMS
VoltageNot reported
Capacity200 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2026-08-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

West Point, MS 500-kV Substation (161-kV) substation: 2 requests in the TVA queue, 2 active totaling 400 MW.

Queue IDProjectMWResourceStatus
466Not reported200SolarActive

Clay, MS: 16 requests in the TVA queue, 5 active totaling 850 MW.

Tracked changes

Not tracked. TVA rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityTennessee Valley Authority
Project typeGeneration
Study phase (standardized by Berkeley Lab)Facility Study
Queue date2023-12-10

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first