Clay, MS interconnection queue
5 active projects totaling 850 MW in the TVA queue, plus 11 with terminal status (shown grayed).
5active projects
850active MW
16total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 129 | Not reported | n/r | 1,340 | Other | Withdrawn |
| 130 | Not reported | n/r | 1,240 | Other | Withdrawn |
| 122 | Not reported | n/r | 800 | Other | Withdrawn |
| 131 | Not reported | n/r | 800 | Other | Withdrawn |
| 101 | Not reported | n/r | 608 | Other | Withdrawn |
| 121 | Not reported | n/r | 510 | Other | Withdrawn |
| 229 | Not reported | n/r | 200 | Gas | Withdrawn |
| 423 | Not reported | n/r | 200 | Solar | Active |
| 429 | Not reported | n/r | 200 | Battery | Active |
| 454 | Not reported | n/r | 200 | Solar | Withdrawn |
| 466 | Not reported | n/r | 200 | Solar | Active |
| 600 | Not reported | n/r | 200 | Battery | Active |
| 433 | Not reported | n/r | 100 | Battery | Withdrawn |
| 283 | Not reported | n/r | 60 | Solar | Withdrawn |
| 424 | Not reported | n/r | 50 | Battery | Active |
| 455 | Not reported | n/r | 50 | Battery | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.