Substation Scout

West Point, MS 500-kV Substation (161-kV) substation interconnection queue

2 active projects totaling 400 MW in the TVA queue.

2 TVA queue filings name West Point, MS 500-kV Substation (161-kV) as the point of interconnection, all in Clay County, MS.

2active projects
400active MW
2total filed
Queue IDProjectkVMWResourceStatus
466 Not reported n/r 200 Solar Active
600 Not reported n/r 200 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first