TVA request 423
TVA queue ID 423
Queue request 423 was listed in the TVA interconnection queue at the end of 2025 as a 200 MW solar project in Clay County, MS, according to Berkeley Lab’s queue data file. The filing names West Point 161-kV Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of January 31, 2026.
| Queue ID | 423 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | West Point 161-kV Substation |
| Point of interconnection | West Point 161-kV Substation |
| County | Clay |
| State | MS |
| Voltage | Not reported |
| Capacity | 200 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Proposed online date | 2026-01-31 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
West Point 161-kV Substation substation: 3 requests in the TVA queue, 3 active totaling 450 MW.
Clay, MS: 16 requests in the TVA queue, 5 active totaling 850 MW.
Tracked changes
Not tracked. TVA rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Tennessee Valley Authority |
|---|---|
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Executed |
| Queue date | 2020-04-21 |