Muhlenberg, KY interconnection queue

10 active projects totaling 2,691 MW in the TVA queue, plus 4 with terminal status (shown grayed).

10active projects
2,691active MW
14total filed
Queue IDProjectkVMWResourceStatus
152 Not reported n/r 1,500 Other Withdrawn
243 Not reported n/r 1,184 Gas Operational
417 Not reported n/r 780 Gas Active
145 Not reported n/r 750 Other Withdrawn
146 Not reported n/r 750 Other Withdrawn
56 Not reported n/r 640 Other Withdrawn
536 Not reported n/r 250 Solar Active
649 Not reported n/r 119 Solar Active
642 Not reported n/r 96 Solar Active
650 Not reported n/r 72 Solar Active
657 Not reported n/r 60 Gas Active
24 Not reported n/r 48 Other Operational
22 Not reported n/r 41 Other Operational
23 Not reported n/r 41 Other Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.