Substation Scout

TVA request 650

TVA queue ID 650

Queue request 650 was listed in the TVA interconnection queue at the end of 2025 as a 72 MW solar project in Muhlenberg County, KY, according to Berkeley Lab’s queue data file. The filing names Paradise CC 161-kV Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 1, 2029.

Queue ID650
Project nameNot reported
Status (as published)Active
SubstationParadise CC 161-kV Substation
Point of interconnectionParadise CC 161-kV Substation
CountyMuhlenberg
StateKY
VoltageNot reported
Capacity72 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2029-10-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Muhlenberg, KY: 14 requests in the TVA queue, 10 active totaling 2,691 MW.

Tracked changes

Not tracked. TVA rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityTennessee Valley Authority
ClusterTC25-047
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Queue date2024-09-23

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.