TVA request 417
TVA queue ID 417
Queue request 417 was listed in the TVA interconnection queue at the end of 2025 as a 780 MW gas project in Muhlenberg County, KY, according to Berkeley Lab’s queue data file. The filing names Paradise 500-kV Station as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 1, 2022.
| Queue ID | 417 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Paradise 500-kV Station |
| Point of interconnection | Paradise 500-kV Station |
| County | Muhlenberg |
| State | KY |
| Voltage | Not reported |
| Capacity | 780 MW |
| Resource (as published) | Gas |
| Resource category | Gas (normalized for filtering) |
| Proposed online date | 2022-10-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Muhlenberg, KY: 14 requests in the TVA queue, 10 active totaling 2,691 MW.
Tracked changes
Not tracked. TVA rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Tennessee Valley Authority |
|---|---|
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Executed |
| Queue date | 2020-02-10 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.