Limestone, AL interconnection queue

8 active projects totaling 573 MW in the TVA queue, plus 7 with terminal status (shown grayed).

8active projects
573active MW
15total filed
Queue IDProjectkVMWResourceStatus
456 Not reported n/r 300 Hybrid Withdrawn
324 Not reported n/r 200 Solar Withdrawn
254 Not reported n/r 155 Nuclear Active
255 Not reported n/r 155 Nuclear Active
256 Not reported n/r 155 Nuclear Active
330 Not reported n/r 69 Solar Withdrawn
440 Not reported n/r 67 Hybrid Withdrawn
215 Not reported n/r 50 Gas Withdrawn
216 Not reported n/r 50 Gas Withdrawn
199 Not reported n/r 35 Other Operational
200 Not reported n/r 35 Other Operational
214 Not reported n/r 35 Gas Withdrawn
351 Not reported n/r 17 Nuclear Operational
248 Not reported n/r 15 Solar Operational
625 Not reported n/r 6 Nuclear Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.