TVA request 254

TVA queue ID 254

Queue request 254 was listed in the TVA interconnection queue at the end of 2025 as a 155 MW nuclear project in Limestone County, AL, according to Berkeley Lab’s queue data file. The filing names BFN 500-kV Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of April 30, 2018.

Queue ID254
Project nameNot reported
Status (as published)Active
SubstationBFN 500-kV Substation
Point of interconnectionBFN 500-kV Substation
CountyLimestone
StateAL
VoltageNot reported
Capacity155 MW
Resource (as published)Nuclear
Resource categoryNuclear (normalized for filtering)
Proposed online date2018-04-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

BFN 500-kV Substation substation: 3 requests in the TVA queue, 3 active totaling 465 MW.

Queue IDProjectMWResourceStatus
255Not reported155NuclearActive
256Not reported155NuclearActive

Limestone, AL: 15 requests in the TVA queue, 8 active totaling 573 MW.

Tracked changes

Not tracked. TVA rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityTennessee Valley Authority
Project typeUpgrade
Study phase (standardized by Berkeley Lab)IA Executed
Queue date2014-08-15

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first