Queue request 625 was listed in the TVA interconnection queue at the end of 2025 as a 6 MW nuclear project in Limestone County, AL, according to Berkeley Lab’s queue data file. The filing names Browns Ferry Nuclear Plant 500-kV Switchyard as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of April 12, 2028.

Queue ID625
Project nameNot reported
Status (as published)Active
SubstationBrowns Ferry Nuclear Plant 500-kV Switchyard
Point of interconnectionBrowns Ferry Nuclear Plant 500-kV Switchyard
CountyLimestone
StateAL
VoltageNot reported
Capacity6 MW
Resource (as published)Nuclear
Resource categoryNuclear (normalized for filtering)
Proposed online date2028-04-12
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Limestone, AL: 15 requests in the TVA queue, 8 active totaling 573 MW.

Tracked changes

Not tracked. TVA rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityTennessee Valley Authority
ClusterTC25-025
Project typeUpgrade
Study phase (standardized by Berkeley Lab)Cluster Study
Queue date2024-06-12

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.