Shaffer
In NV Energy’s Annual Progress Report to the Western Electricity Coordinating Council, project “Shaffer Substation - LMUD Interconnection”.
Described as new. The quoted wording calls this substation new. “interconnect a 30MW of load at new NV Energy Point of Interconnection at 345kV 'Shaffer' substation” — NV Energy 2026 Annual Progress Report, p.3
Note. The report says Shaffer folds into the Hilltop - Ft Sage 345 kV line next to Lassen Municipal Utilities District's Skedaddle 60 kV switching station, with a new 345/60 kV transformer. The report does not say which state Shaffer is in; Lassen Municipal Utilities District serves Lassen County, California.
The progress report prints no county for this substation, and none has been found printed for it elsewhere yet.
Location
Lassen County, CA
County only. A source prints the county; no point is published. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: No point taken. The IS/MND prints the parcel (APN 121-050-10-11, about 162 acres, in Section 19, Township 29N, Range 16E, addressed 736415 Wendel Road, north of Wendel Road and west of Helman Road) and says the Skedaddle and Shaffer substations would be near its middle; the parcel outline was not retrieved from Lassen County GIS, so no centroid was computed. This is a lead for a parcel-or-address-printed point.
Note: Line name: NV Energy's 2026 report folds the "Hilltop – Ft Sage 345 kV line"; LMUD's 2019 IS/MND connects Shaffer to "the existing NV Energy Reno-Alturas 345-kV line" (the same corridor under an older name, by the IS/MND's description of a line crossing the parcel "in a northwesterly direction").
Sources: NV Energy 2026 Annual Progress Report to WECC (2026), p.3 · Lassen Municipal Utility District, Draft Initial Study/Mitigated Negative Declaration for the Proposed Skedaddle Interconnection Project (SCH 2019069071) (June 2019), printed p.7-10 · LMUD Notice of Determination, Skedaddle Interconnection Project (SCH 2019069071) (2019), p.1 · TANC opposition letter to NV Energy's WECC waiver request for the Shaffer Substation – LMUD project (2025-04-23), p.1. Researched by Substation Scout; checked November 21, 2026.
Generation interconnection requests filed in Lassen, CA: NV Energy queue, 4 active of 7. Same county, not the same substation.
Source: WECC Annual Progress Reports filed with the WECC Studies Subcommittee: NV Energy 2026 Annual Progress Report (dated March 4, 2026); NV Energy 2025 Annual Progress Report (dated February 3, 2025); GridLiance West 2026 Annual Progress Report (dated March 13, 2026). Retrieved 2026-11-21; records reviewed by hand 2026-11-21.
Before relying on any of this
- The WECC Annual Progress Reports print no county for a substation. A county shown here is printed for that station elsewhere; otherwise it is left blank.
- WECC asks for transmission additions over 200 kV, generation of 200 MW or more, and smaller facilities that may have a significant regional impact (the thresholds as Valley Electric’s 2026 report states them). NV Energy also lists many 120 kV and 138 kV projects, but a substation missing from a report may still be planned.
- An in-service date is the one the report prints, not a construction schedule.