Johnnie Corner
In GridLiance West’s Annual Progress Report to the Western Electricity Coordinating Council, project “GLW Beatty Area 230 kV Project - CAISO 2022-2023 TPP”.
Described as new. The quoted wording calls this substation new. “Build a new Johnnie Corner 230 kV station and loop into the Pahrump - Innovation 230 kV line.” — GridLiance West 2026 Annual Progress Report, p.3
Note. Part of GridLiance West's Beatty Area 230 kV Project, approved in CAISO's 2022-2023 Transmission Plan to provide 230 kV capacity for new generation proposed in Valley Electric Association's Beatty area.
The progress report prints no county for this substation, and none has been found printed for it elsewhere yet.
Location
Nye County, NV
County only. A source prints the county; no point is published. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: No point. The NDEP 401 application map (GridLiance West Core Upgrades, December 2024) draws a proposed-substation triangle labelled PROPOSED JOHNNIE CORNER SUBSTATION on the Pahrump-Innovation line north of Pahrump, but at 1:500,000 a read is worse than ±1,000 m. The station loops into the Pahrump-Innovation 230 kV line, whose endpoints are both in Nye County (HIFLD PAHRUMP 36.1971, -115.9688; INNOVATION 36.5825, -115.9474); Census at points along that corridor (36.30-36.50 N, about -115.95) returns Nye.
Note: The news quote speaks of "the Johnnie Corner substation" as an existing starting point, while the GridLiance West report says "Build a new Johnnie Corner 230 kV station"; the NDEP map labels it proposed. Possibly a new 230 kV yard at or beside an existing 138 kV Johnnie Corner facility; not resolved.
Sources: GridLiance West 2026 Annual Progress Report to WECC (2026), p.3 · Pahrump Valley Times, "When will GridLiance be transporting more oversized equipment over Highway 160?" (quotes GridLiance West's project description) (2025-11-28) · NDEP Clean Water Act Section 401 application, GridLiance West Core Upgrades Transmission Line Project, with Project Location map (map dated December 2024), p.36. Researched by Substation Scout; checked November 21, 2026.
Generation interconnection requests filed in Nye, NV: NV Energy queue, 6 active of 22. Same county, not the same substation.
Source: WECC Annual Progress Reports filed with the WECC Studies Subcommittee: NV Energy 2026 Annual Progress Report (dated March 4, 2026); NV Energy 2025 Annual Progress Report (dated February 3, 2025); GridLiance West 2026 Annual Progress Report (dated March 13, 2026). Retrieved 2026-11-21; records reviewed by hand 2026-11-21.
Before relying on any of this
- The WECC Annual Progress Reports print no county for a substation. A county shown here is printed for that station elsewhere; otherwise it is left blank.
- WECC asks for transmission additions over 200 kV, generation of 200 MW or more, and smaller facilities that may have a significant regional impact (the thresholds as Valley Electric’s 2026 report states them). NV Energy also lists many 120 kV and 138 kV projects, but a substation missing from a report may still be planned.
- An in-service date is the one the report prints, not a construction schedule.