Substation Scout

Rootbeer

In the 2025 MISO Transmission Expansion Plan (MTEP25), project 50616 of Ameren Missouri, MISO Central region.

MOstate, from the owner’s name
345kV as printed
$2.0Mestimated cost, as printed
12/1/2026in service, as printed

Described as new. The quoted wording calls this substation new. “New Rootbeer 345 kV Substation Load Addition” — MTEP25 Report (2025 MISO Transmission Expansion Plan), project 50616, p.59

Project50616: “New Rootbeer 345 kV Substation Load Addition” (p.59)
Transmission ownerAmeren Missouri (AMMO)
CategoryLoad Growth
Expedited Project ReviewYes, as the report marks it

The MTEP report prints no county for this substation.

Location

38.9050, -91.2090 · Warren County, MO · view on a map

OpenStreetMap, corroborated. An OpenStreetMap feature carries this exact name, and a cited source agrees. Accurate to about ±150 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

How it was located: OpenStreetMap way 1434770611, "Rootbeer Substation" (power=substation, voltage 345000), mapped 2025-10-02; the point is the centre of the mapped outline (corners 38.9043-38.9059 N, -91.2100 to -91.2075 W, about 175 x 215 m). ±150 m (outline extent).

County: the Census county at this point.

Sources: MISO MTEP25 Report (2025 MISO Transmission Expansion Plan), approved by the MISO Board 2025-12-11 (December 2025), p.59 · OpenStreetMap: Rootbeer Substation (way 1434770611), 345 kV (version 1, 2025-10-02) · Missouri PSC EFIS, public comment P202600649 in Case ET-2025-0184 (Ameren Missouri large-load tariff) (filed 2025-09-11), comment text. Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.

Generation interconnection requests filed in Warren, MO: MISO queue, 3 active of 5. Same county, not the same substation.

Source: MTEP25 Report (2025 MISO Transmission Expansion Plan), approved by the MISO Board of Directors December 11, 2025; 428 of its 432 Appendix A projects are printed by name. Retrieved 2026-11-21; stations reviewed by hand 2026-11-21.

Before relying on any of this

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first