Rootbeer
In the 2025 MISO Transmission Expansion Plan (MTEP25), project 50616 of Ameren Missouri, MISO Central region.
Described as new. The quoted wording calls this substation new. “New Rootbeer 345 kV Substation Load Addition” — MTEP25 Report (2025 MISO Transmission Expansion Plan), project 50616, p.59
| Project | 50616: “New Rootbeer 345 kV Substation Load Addition” (p.59) |
|---|---|
| Transmission owner | Ameren Missouri (AMMO) |
| Category | Load Growth |
| Expedited Project Review | Yes, as the report marks it |
The MTEP report prints no county for this substation.
Location
38.9050, -91.2090 · Warren County, MO · view on a map
OpenStreetMap, corroborated. An OpenStreetMap feature carries this exact name, and a cited source agrees. Accurate to about ±150 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: OpenStreetMap way 1434770611, "Rootbeer Substation" (power=substation, voltage 345000), mapped 2025-10-02; the point is the centre of the mapped outline (corners 38.9043-38.9059 N, -91.2100 to -91.2075 W, about 175 x 215 m). ±150 m (outline extent).
County: the Census county at this point.
Sources: MISO MTEP25 Report (2025 MISO Transmission Expansion Plan), approved by the MISO Board 2025-12-11 (December 2025), p.59 · OpenStreetMap: Rootbeer Substation (way 1434770611), 345 kV (version 1, 2025-10-02) · Missouri PSC EFIS, public comment P202600649 in Case ET-2025-0184 (Ameren Missouri large-load tariff) (filed 2025-09-11), comment text. Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.
Generation interconnection requests filed in Warren, MO: MISO queue, 3 active of 5. Same county, not the same substation.
Source: MTEP25 Report (2025 MISO Transmission Expansion Plan), approved by the MISO Board of Directors December 11, 2025; 428 of its 432 Appendix A projects are printed by name. Retrieved 2026-11-21; stations reviewed by hand 2026-11-21.
Before relying on any of this
- The MTEP report prints no state or county column. A state shown here is the one printed in the transmission owner’s name (“Ameren Missouri”, “Entergy Texas”); for owners that serve several states it is left blank, as is a county no source prints for the station.
- The report prints 428 of the 432 projects in its Appendix A by name; a project it does not print is not read here, and a substation built under a project whose name does not describe a new station is not listed.
- An in-service date and a cost are the ones the report prints (cost in millions of dollars, as estimated), not a construction schedule.
- A few projects are printed only as a heading over a map image (baseline reliability projects such as Pond Creek and War Eagle); their in-service date and cost appear in the image, not the report’s text, and are not shown here.