Substation Scout

Pond Creek

In the 2025 MISO Transmission Expansion Plan (MTEP25), project 50722 of Indianapolis Power & Light Company, MISO Central region.

INstate, from the owner’s name
345, 138kV as printed
—estimated cost, as printed
—in service, as printed

Described as new. The quoted wording calls this substation new. “New Pond Creek 345 : 138 kV Substation” — MTEP25 Report (2025 MISO Transmission Expansion Plan), project 50722, p.78

Project50722: “New Pond Creek 345 : 138 kV Substation” (p.78)
Transmission ownerIndianapolis Power & Light Company (IPL)
CategoryNot printed
Expedited Project ReviewNot marked

The MTEP report prints no county for this substation.

Location

Pike County, IN

County only. A source prints the county; no point is published. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

How it was located: No point. The MTEP25 geographic map for P50722 draws a "New station/tap" dot on the existing network, but the map prints no place names, roads or county lines to anchor it, so it is not read as a point. Not in OSM by name (Overpass, Indiana, 2026-11-21).

Sources: MISO 2025 Transmission Expansion Plan (MTEP25) Report, approved by the MISO Board of Directors 2025-12-11 (December 2025), p.78. Researched by Substation Scout; checked November 21, 2026.

Generation interconnection requests filed in Pike, IN: MISO queue, 8 active of 19. Same county, not the same substation.

Source: MTEP25 Report (2025 MISO Transmission Expansion Plan), approved by the MISO Board of Directors December 11, 2025; 428 of its 432 Appendix A projects are printed by name. Retrieved 2026-11-21; stations reviewed by hand 2026-11-21.