Pond Creek
In the 2025 MISO Transmission Expansion Plan (MTEP25), project 50722 of Indianapolis Power & Light Company, MISO Central region.
Described as new. The quoted wording calls this substation new. “New Pond Creek 345 : 138 kV Substation” — MTEP25 Report (2025 MISO Transmission Expansion Plan), project 50722, p.78
| Project | 50722: “New Pond Creek 345 : 138 kV Substation” (p.78) |
|---|---|
| Transmission owner | Indianapolis Power & Light Company (IPL) |
| Category | Not printed |
| Expedited Project Review | Not marked |
The MTEP report prints no county for this substation.
Location
Pike County, IN
County only. A source prints the county; no point is published. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: No point. The MTEP25 geographic map for P50722 draws a "New station/tap" dot on the existing network, but the map prints no place names, roads or county lines to anchor it, so it is not read as a point. Not in OSM by name (Overpass, Indiana, 2026-11-21).
Sources: MISO 2025 Transmission Expansion Plan (MTEP25) Report, approved by the MISO Board of Directors 2025-12-11 (December 2025), p.78. Researched by Substation Scout; checked November 21, 2026.
Generation interconnection requests filed in Pike, IN: MISO queue, 8 active of 19. Same county, not the same substation.
Source: MTEP25 Report (2025 MISO Transmission Expansion Plan), approved by the MISO Board of Directors December 11, 2025; 428 of its 432 Appendix A projects are printed by name. Retrieved 2026-11-21; stations reviewed by hand 2026-11-21.
Before relying on any of this
- The MTEP report prints no state or county column. A state shown here is the one printed in the transmission owner’s name (“Ameren Missouri”, “Entergy Texas”); for owners that serve several states it is left blank, as is a county no source prints for the station.
- The report prints 428 of the 432 projects in its Appendix A by name; a project it does not print is not read here, and a substation built under a project whose name does not describe a new station is not listed.
- An in-service date and a cost are the ones the report prints (cost in millions of dollars, as estimated), not a construction schedule.
- A few projects are printed only as a heading over a map image (baseline reliability projects such as Pond Creek and War Eagle); their in-service date and cost appear in the image, not the report’s text, and are not shown here.