Moonshine Solar Bootleg
In the 2025 MISO Transmission Expansion Plan (MTEP25), project 25018 of Ameren Illinois, MISO Central region.
Described as new. The quoted wording calls this substation new. “New Moonshine Solar Bootleg 138 kV switching station (J1382)” — MTEP25 Report (2025 MISO Transmission Expansion Plan), project 25018, p.57
| Project | 25018: “New Moonshine Solar Bootleg 138 kV switching station (J1382)” (p.57) |
|---|---|
| Transmission owner | Ameren Illinois (AMIL) |
| Category | Not printed |
| Expedited Project Review | Not marked |
Note. The project is the generator interconnection for MISO queue position J1382, as the project name prints it.
The MTEP report prints no county for this substation.
Location
Clark County, IL
County only. A source prints the county; no point is published. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: No point. EDPR's April 2025 project layout map draws the developer's "Project Substation" near Oak Point, Clark County, but not Ameren's switching station; the switching station's own site is not printed.
Note: Timing: MTEP25 prints an in-service date of 12/1/2025, but EDPR told Clark County on 2025-06-10 that construction was "expected to start after this year's harvest and hoping to be completed at the end of 2026 and operational by 2027", and its fact sheet gives estimated commercial operation 2026. Capacity: the queue lists 150 MW; the EDPR fact sheet says 200 MW. Location caveat: the queue county is the request's county; the project area (Johnson Township, near Oak Point) lies 1-3 km east of the Clark/Cumberland county line (Census: -88.00 Clark, -88.01 Cumberland at 39.2 N), and the switching station's own parcel is not printed.
Sources: MISO MTEP25 Report (2025 MISO Transmission Expansion Plan), approved by the MISO Board 2025-12-11 (December 2025), p.57 · MISO interconnection queue request J1382 (Hutsonville - Neoga 138 kV Line tap), as listed by interconnection.fyi (queue date 2019-04-29), project record · Clark County, Illinois, minutes of the public hearing on solar projects (Moonshine Solar Park) (2025-06-10), p.1 · EDP Renewables, Moonshine Solar Park fact sheet (Clark County, Illinois) (2025-06), p.1 · EDP Renewables, Moonshine Solar Park open house posters, Project Layout map (map dated 2025-04-03), PDF p.7. Researched by Substation Scout; checked November 21, 2026.
Generation interconnection requests filed in Clark, IL: MISO queue, 9 active of 10. Same county, not the same substation.
Source: MTEP25 Report (2025 MISO Transmission Expansion Plan), approved by the MISO Board of Directors December 11, 2025; 428 of its 432 Appendix A projects are printed by name. Retrieved 2026-11-21; stations reviewed by hand 2026-11-21.
Before relying on any of this
- The MTEP report prints no state or county column. A state shown here is the one printed in the transmission owner’s name (“Ameren Missouri”, “Entergy Texas”); for owners that serve several states it is left blank, as is a county no source prints for the station.
- The report prints 428 of the 432 projects in its Appendix A by name; a project it does not print is not read here, and a substation built under a project whose name does not describe a new station is not listed.
- An in-service date and a cost are the ones the report prints (cost in millions of dollars, as estimated), not a construction schedule.
- A few projects are printed only as a heading over a map image (baseline reliability projects such as Pond Creek and War Eagle); their in-service date and cost appear in the image, not the report’s text, and are not shown here.