9 active projects totaling 1,598.6 MW in the MISO queue, plus 1 with terminal status (shown grayed).
9active projects
1,598.6active MW
10total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J1263 | Not reported | 345 | 408.6 | Hybrid | Active |
| J3950 | Not reported | 345 | 340 | Solar | Active |
| J3256 | Not reported | 138 | 200 | Solar | Active |
| J1382 | Not reported | 138 | 150 | Solar | Active |
| J2170 | Not reported | 345 | 150 | Battery | Active |
| J3695 | Not reported | 345 | 150 | Battery | Active |
| J1180 | Not reported | 345 | 75 | Solar | Active |
| J1475 | Not reported | 345 | 75 | Solar | Active |
| J2158 | Not reported | 138 | 50 | Solar | Withdrawn |
| J2159 | Not reported | 138 | 50 | Battery | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.