9 active projects totaling 1,598.6 MW in the MISO queue, plus 1 with terminal status (shown grayed).

9active projects
1,598.6active MW
10total filed
Queue IDProjectkVMWResourceStatus
J1263 Not reported 345 408.6 Hybrid Active
J3950 Not reported 345 340 Solar Active
J3256 Not reported 138 200 Solar Active
J1382 Not reported 138 150 Solar Active
J2170 Not reported 345 150 Battery Active
J3695 Not reported 345 150 Battery Active
J1180 Not reported 345 75 Solar Active
J1475 Not reported 345 75 Solar Active
J2158 Not reported 138 50 Solar Withdrawn
J2159 Not reported 138 50 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.