Merom

In the 2025 MISO Transmission Expansion Plan (MTEP25), project 50599 of Hoosier Energy REC, Inc., MISO Central region.

Not printedstate
345kV as printed
$12.8Mestimated cost, as printed
7/1/2026in service, as printed

Described as new. The quoted wording calls this substation new. “New Merom 345 kV Substation Load Addition” — MTEP25 Report (2025 MISO Transmission Expansion Plan), project 50599, p.68

Project50599: “New Merom 345 kV Substation Load Addition” (p.68)
Transmission ownerHoosier Energy REC, Inc. (HE)
CategoryLoad Growth
Expedited Project ReviewYes, as the report marks it

Related project. A separate Hoosier Energy project at the existing Merom Station: “Merom Station 345 kV Expansion and New 345 kV line”. Project 50490, in service 12/1/2030, $14.0M (p.68).

The MTEP report prints no county for this substation.

Location

Sullivan County, IN

County of the area the plan places it in. No source prints a location. The plan places the substation relative to a mapped feature, and everywhere within that range is in one county. No point is published. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

How it was located: No point. The MTEP25 map (Figure 4.3.12-1) marks the project with a large star at statewide-inset scale, far coarser than ±1,000 m; the text places it only relative to the Merom Transmission Station.

Note: The project is named a "New Merom 345 kV Substation" but the description reads as a new 345 kV line from the existing Merom Transmission Station to the customer's data center; what new station is built, and whether it is Hoosier's or the customer's, is not printed. A separate row, 50490 "Merom Station 345 kV Expansion and New 345 kV line" (ISD 12/1/2030), expands the existing station.

County: the plan prints “Extend a new 345kV line from Merom Transmission Station, approximately 1-mile, to a new data center. ... A new data center customer has plans to construct a 620 MW facility within Hoosier Energy's service territory, approximately 1-mile from Hoosier Energy's Merom Transmission Station.”. Census TIGERweb county at the anchor, at 12 points on a 3 km circle and 8 points on a 5 km circle around it: all Sullivan County, Indiana (FIPS 18153). The Wabash River (Illinois line) lies west of the circle. 5 km allows the printed "approximately 1-mile" to be read as up to 3 miles.

Sources: MISO MTEP25 Report (2025 MISO Transmission Expansion Plan), approved by the MISO Board of Directors 2025-12-11 (December 2025), p.68 · HIFLD Electric Substations: MEROM STATION (Merom, Sullivan County, IN, 345 kV) (HIFLD snapshot as ingested by Site Scanner) · Census TIGERweb county lookup (circle check around the Merom station) (queried 2026-11-21). Researched by Substation Scout; checked November 21, 2026.

Generation interconnection requests filed in Sullivan, IN: PJM queue, 8 active of 19 · MISO queue, 20 active of 27. Same county, not the same substation.

Source: MTEP25 Report (2025 MISO Transmission Expansion Plan), approved by the MISO Board of Directors December 11, 2025; 428 of its 432 Appendix A projects are printed by name. Retrieved 2026-11-21; stations reviewed by hand 2026-11-21.