Merom
In the 2025 MISO Transmission Expansion Plan (MTEP25), project 50599 of Hoosier Energy REC, Inc., MISO Central region.
Described as new. The quoted wording calls this substation new. “New Merom 345 kV Substation Load Addition” — MTEP25 Report (2025 MISO Transmission Expansion Plan), project 50599, p.68
| Project | 50599: “New Merom 345 kV Substation Load Addition” (p.68) |
|---|---|
| Transmission owner | Hoosier Energy REC, Inc. (HE) |
| Category | Load Growth |
| Expedited Project Review | Yes, as the report marks it |
Related project. A separate Hoosier Energy project at the existing Merom Station: “Merom Station 345 kV Expansion and New 345 kV line”. Project 50490, in service 12/1/2030, $14.0M (p.68).
The MTEP report prints no county for this substation.
Location
Sullivan County, IN
County of the area the plan places it in. No source prints a location. The plan places the substation relative to a mapped feature, and everywhere within that range is in one county. No point is published. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: No point. The MTEP25 map (Figure 4.3.12-1) marks the project with a large star at statewide-inset scale, far coarser than ±1,000 m; the text places it only relative to the Merom Transmission Station.
Note: The project is named a "New Merom 345 kV Substation" but the description reads as a new 345 kV line from the existing Merom Transmission Station to the customer's data center; what new station is built, and whether it is Hoosier's or the customer's, is not printed. A separate row, 50490 "Merom Station 345 kV Expansion and New 345 kV line" (ISD 12/1/2030), expands the existing station.
County: the plan prints “Extend a new 345kV line from Merom Transmission Station, approximately 1-mile, to a new data center. ... A new data center customer has plans to construct a 620 MW facility within Hoosier Energy's service territory, approximately 1-mile from Hoosier Energy's Merom Transmission Station.”. Census TIGERweb county at the anchor, at 12 points on a 3 km circle and 8 points on a 5 km circle around it: all Sullivan County, Indiana (FIPS 18153). The Wabash River (Illinois line) lies west of the circle. 5 km allows the printed "approximately 1-mile" to be read as up to 3 miles.
Sources: MISO MTEP25 Report (2025 MISO Transmission Expansion Plan), approved by the MISO Board of Directors 2025-12-11 (December 2025), p.68 · HIFLD Electric Substations: MEROM STATION (Merom, Sullivan County, IN, 345 kV) (HIFLD snapshot as ingested by Site Scanner) · Census TIGERweb county lookup (circle check around the Merom station) (queried 2026-11-21). Researched by Substation Scout; checked November 21, 2026.
Generation interconnection requests filed in Sullivan, IN: PJM queue, 8 active of 19 · MISO queue, 20 active of 27. Same county, not the same substation.
Source: MTEP25 Report (2025 MISO Transmission Expansion Plan), approved by the MISO Board of Directors December 11, 2025; 428 of its 432 Appendix A projects are printed by name. Retrieved 2026-11-21; stations reviewed by hand 2026-11-21.
Before relying on any of this
- The MTEP report prints no state or county column. A state shown here is the one printed in the transmission owner’s name (“Ameren Missouri”, “Entergy Texas”); for owners that serve several states it is left blank, as is a county no source prints for the station.
- The report prints 428 of the 432 projects in its Appendix A by name; a project it does not print is not read here, and a substation built under a project whose name does not describe a new station is not listed.
- An in-service date and a cost are the ones the report prints (cost in millions of dollars, as estimated), not a construction schedule.
- A few projects are printed only as a heading over a map image (baseline reliability projects such as Pond Creek and War Eagle); their in-service date and cost appear in the image, not the report’s text, and are not shown here.