Substation Scout

Sullivan, IN interconnection queue

20 active projects totaling 6,576.8 MW in the MISO queue, plus 7 with terminal status (shown grayed).

20active projects
6,576.8active MW
27total filed
Queue IDProjectkVMWResourceStatus
J3604 Not reported 345 650 Gas Active
J3084 Not reported 345 641.8 Gas Active
G039 Not reported n/r 600 Coal Withdrawn
J3075 Not reported 345 560 Hybrid Active
E0054 Merom Station n/r 530 Hybrid Active
J4005 Not reported 345 500 Gas Active
J3331 Not reported 345 470 Gas Active
J4021 Not reported 345 470 Gas Active
APP-100245 Merom Storage 345 405 Hybrid Active
J2194 Not reported 345 350 Solar Withdrawn
J2270 Not reported 345 300 Solar Active
J3318 Not reported 345 300 Hybrid Withdrawn
J829 Not reported 345 250 Solar Active
J824 Not reported 138 245 Solar Withdrawn
J1691 Not reported 345 200 Solar Active
J1786 Not reported 345 200 Solar Active
J2230 Not reported 345 200 Solar Active
J2295 Not reported 345 200 Solar Withdrawn
J2472 Not reported 345 200 Battery Active
J3978 Not reported 345 200 Hybrid Active
J3979 Not reported 345 200 Hybrid Active
J3980 Not reported 345 200 Hybrid Active
J3981 Not reported 345 200 Hybrid Active
J2407 Not reported 345 198 Solar Withdrawn
J3329 Not reported 345 145 Battery Withdrawn
J2178 Not reported 345 100 Battery Active
J2296 Not reported 345 100 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first