Substation Scout

Green Acres

In the 2025 MISO Transmission Expansion Plan (MTEP25), project 50602 of Entergy Mississippi LLC, MISO South region.

MSstate, from the owner’s name
500, 230kV as printed
$312.0Mestimated cost, as printed
12/1/2029in service, as printed

Described as new. The quoted wording calls this substation new. “Green Acres 500/230 kV New Substation” — MTEP25 Report (2025 MISO Transmission Expansion Plan), project 50602, p.127

Project50602: “Green Acres 500/230 kV New Substation” (p.127)
Transmission ownerEntergy Mississippi LLC (EML)
CategoryLoad Growth
Expedited Project ReviewNot marked

The MTEP report prints no county for this substation.

Location

32.4044, -90.2200 · Madison County, MS · view on a map

Point published by the utility. The utility publishes this point, on a project map or in a filing. Accurate to about ±500 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

How it was located: Printed by the Mississippi DEQ construction storm water coverage certificate for the Green Acres Substation (MSR109619, AI 89056): "Location: 32.40444, -90.22". It is the permitted project's location, covering "a total of 135.44 acres" of land disturbance (about 740 m on a side if square), and where the yard sits inside it is not printed; ±500 m. Same AI as Entergy's Traceview Advanced Power Station (1972 W County Line Road, Ridgeland; its coverage prints 32.4056, -90.2206, about 130 m away). The Hinds County line (County Line Road) is about 350 m south of the point.

Sources: MISO MTEP25 Report (approved by the MISO Board of Directors 2025-12-11) (December 2025), p.128 · Mississippi DEQ Certificate of Permit Coverage, Large Construction Storm Water General NPDES Permit, MSR109619, Entergy Mississippi, Inc. – Green Acres Substation (coverage 2026-08-19, modified 2026-11-16), p.1 · MDEQ enSearch Online, AI 89056 Entergy Mississippi LLC, Traceview Advanced Power Station (alternate name: Green Acres Substation, MSR109619) (n/a (retrieved 2026-11-21)), facility details · Mississippi DEQ Certificate of Permit Coverage MSR109942, Entergy Mississippi, Inc. - Traceview Advanced Power Station (coverage 2026-08-24, modified 2026-11-16), p.1. Researched by Substation Scout; checked November 21, 2026.

Generation interconnection requests filed in Madison, MS: MISO queue, 7 active of 15. Same county, not the same substation.

Source: MTEP25 Report (2025 MISO Transmission Expansion Plan), approved by the MISO Board of Directors December 11, 2025; 428 of its 432 Appendix A projects are printed by name. Retrieved 2026-11-21; stations reviewed by hand 2026-11-21.

Before relying on any of this