Green Acres
In the 2025 MISO Transmission Expansion Plan (MTEP25), project 50602 of Entergy Mississippi LLC, MISO South region.
Described as new. The quoted wording calls this substation new. “Green Acres 500/230 kV New Substation” — MTEP25 Report (2025 MISO Transmission Expansion Plan), project 50602, p.127
| Project | 50602: “Green Acres 500/230 kV New Substation” (p.127) |
|---|---|
| Transmission owner | Entergy Mississippi LLC (EML) |
| Category | Load Growth |
| Expedited Project Review | Not marked |
The MTEP report prints no county for this substation.
Location
32.4044, -90.2200 · Madison County, MS · view on a map
Point published by the utility. The utility publishes this point, on a project map or in a filing. Accurate to about ±500 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: Printed by the Mississippi DEQ construction storm water coverage certificate for the Green Acres Substation (MSR109619, AI 89056): "Location: 32.40444, -90.22". It is the permitted project's location, covering "a total of 135.44 acres" of land disturbance (about 740 m on a side if square), and where the yard sits inside it is not printed; ±500 m. Same AI as Entergy's Traceview Advanced Power Station (1972 W County Line Road, Ridgeland; its coverage prints 32.4056, -90.2206, about 130 m away). The Hinds County line (County Line Road) is about 350 m south of the point.
Sources: MISO MTEP25 Report (approved by the MISO Board of Directors 2025-12-11) (December 2025), p.128 · Mississippi DEQ Certificate of Permit Coverage, Large Construction Storm Water General NPDES Permit, MSR109619, Entergy Mississippi, Inc. – Green Acres Substation (coverage 2026-08-19, modified 2026-11-16), p.1 · MDEQ enSearch Online, AI 89056 Entergy Mississippi LLC, Traceview Advanced Power Station (alternate name: Green Acres Substation, MSR109619) (n/a (retrieved 2026-11-21)), facility details · Mississippi DEQ Certificate of Permit Coverage MSR109942, Entergy Mississippi, Inc. - Traceview Advanced Power Station (coverage 2026-08-24, modified 2026-11-16), p.1. Researched by Substation Scout; checked November 21, 2026.
Generation interconnection requests filed in Madison, MS: MISO queue, 7 active of 15. Same county, not the same substation.
Source: MTEP25 Report (2025 MISO Transmission Expansion Plan), approved by the MISO Board of Directors December 11, 2025; 428 of its 432 Appendix A projects are printed by name. Retrieved 2026-11-21; stations reviewed by hand 2026-11-21.
Before relying on any of this
- The MTEP report prints no state or county column. A state shown here is the one printed in the transmission owner’s name (“Ameren Missouri”, “Entergy Texas”); for owners that serve several states it is left blank, as is a county no source prints for the station.
- The report prints 428 of the 432 projects in its Appendix A by name; a project it does not print is not read here, and a substation built under a project whose name does not describe a new station is not listed.
- An in-service date and a cost are the ones the report prints (cost in millions of dollars, as estimated), not a construction schedule.
- A few projects are printed only as a heading over a map image (baseline reliability projects such as Pond Creek and War Eagle); their in-service date and cost appear in the image, not the report’s text, and are not shown here.