Madison, MS interconnection queue

7 active projects totaling 977 MW in the MISO queue, plus 8 with terminal status (shown grayed).

7active projects
977active MW
15total filed
Queue IDProjectkVMWResourceStatus
J2406 Not reported 230 200 Solar Withdrawn
J4154 Not reported n/r 200 Battery Active
J3855 Not reported 230 197.5 Solar Withdrawn
J3049 Not reported 500 188 Solar Active
J3764 Not reported 230 170 Hybrid Active
J3053 Not reported 500 169 Solar Active
J1630 Not reported 230 150 Solar Withdrawn
J2612 Not reported 115 150 Solar Withdrawn
J2358 Not reported n/r 114 Solar Withdrawn
J3093 Not reported 500 100 Battery Active
J585 Not reported n/r 100 Solar Withdrawn
J830 Not reported 230 100 Solar Operational
J2359 Not reported n/r 58.5 Battery Withdrawn
J1747 Not reported n/r 50 Solar Active
J3819 Not reported 230 36.1 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.