Henderson, KY interconnection queue

0 active projects totaling 0 MW in the LG&E and KU queue, plus 4 with terminal status (shown grayed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
LGE-GIS-2007-004 Not reported 345 642 Hybrid Withdrawn
LGE-GIS-2007-003 Not reported 161 640 Gas Withdrawn
LGE-GIS-2019-009 Not reported 161 100 Solar Withdrawn
LGE-GIS-2019-016 Not reported 161 100 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with LG&E and KU before relying on these figures.