Pike, KY interconnection queue

2 active projects totalling 38 MW in the PJM queue, plus 8 with terminal status (shown greyed).

2active projects
38active MW
10total filed
Queue IDProjectkVMWResourceStatus
AH1-418 Elkhorn City - Second Fork 69 kV 69 50 Hybrid Withdrawn
AF2-328 Inez-Johns Creek 138 kV 138 45 Solar Withdrawn
AI2-333 Johns Creek-Excel 138kV I 138 40 Solar Withdrawn
AH2-276 Second Fork 69 kV 69 28 Hybrid Withdrawn
AC1-101 Pike County Solar 138 19 Solar Engineering and Procurement
AC1-102 Pike County Solar 138 19 Solar Engineering and Procurement
AH2-117 Dorton - Henry Clay 46 kV 46 18 Solar Withdrawn
AI2-342 Excel-Johns Creek 138 kV 138 15.4 Solar Withdrawn
AF2-017 John's Creek 34 kV 34 8.4 Solar Withdrawn
W3-051 Dorton 138kV 138 7.8 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.