Great Valley
Named in 1 project in the 2025 GA ITS Ten-Year Plan (2026-2035).
Described as new. The quoted wording calls this substation new. “new Great Valley and Hill View 230kV substations” — TEAMS 20151, plan p.114
Note. Georgia Power's project page describes only Grassy Hollow as a new substation, and OpenStreetMap maps an unnamed Georgia Power substation about 100 m from the page's Great Valley map marker, so Great Valley may already exist. The plan describes it as new. “the Grassy Hollow–Great Valley 230 kV Transmission Project in Bartow County, which includes construction of a new Grassy Hollow substation” — project page, retrieved 2026-11-20
The plan prints no county for this substation, and no utility project page found names one for it.
Location
34.2839, -84.8027 · Bartow County, GA · view on a map
Point published by the utility. The utility publishes this point, on a project map or in a filing. Accurate to about ±300 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: Printed by the sponsor: Georgia Power's Grassy Hollow–Great Valley project page embeds its project map's configuration, with a point marker titled "Great Valley Substation" at 34.28387466, -84.80266586, the first vertex of the printed 230 kV route to Grassy Hollow. Web-map marker, not a survey: the page says "MAP NOT BASED ON FIELD SURVEY DATA" and "Structure and Line Locations based on Pre-Engineering data and subject to change". ±300 m.
Note: The plan calls Great Valley new; Georgia Power's page calls only Grassy Hollow new and connects the line to "the Great Valley substation". OSM already maps an unnamed Georgia Power substation (way 1525009645, no voltage tag) ~100 m from the printed point, so the yard may already be built or under construction.
County: the Census county at this point.
Sources: 2025 GA ITS Ten-Year Plan (2026-2035), Southern Company Services; filed by Georgia Power in GA PSC Docket 56002 (2025 Annual Transmission Update, public disclosure) (filed 2026-02-27), p.114 · 2025 GA ITS Ten-Year Plan (2026-2035), Southern Company Services; filed by Georgia Power in GA PSC Docket 56002 (2025 Annual Transmission Update, public disclosure) (filed 2026-02-27), p.121 · Georgia Power, Grassy Hollow–Great Valley 230 kV Transmission Project page (n/a (retrieved 2026-11-20)), About the Project; Project Map · OpenStreetMap: unnamed Georgia Power substation (way 1525009645) near the printed point (OSM base 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.
Projects naming this substation
As the plan prints them. The sponsor is the project’s; one project can split work between owners.
| Project | Sponsor | Where in the plan | Need date | Change from the previous plan | Substations named |
|---|---|---|---|---|---|
| CC - CASS PINE 230/25kV NEW SUB IMPROVEMENTS Build a new 230/25kV networked substation named Cass Pine in Bartow County that will interconnect between new Great Valley and Hill View 230kV substations. TEAMS 20151 · plan p.114 · zone 211 |
GPC | In the plan p.9 |
Dec 31, 2026 | No change | Cass Pine, Great Valley, Hill View |
Generation interconnection requests filed in Bartow, GA: Southern Company queue, 8 active of 17. Same county, not the same substation.
Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.
Before relying on any of this
- The plan prints no county for a substation. A county shown here is printed in the plan beside the station, or on a Georgia Power or Georgia Transmission project page that names the same station and one county.
- Project Sponsor belongs to the project, not to each station; one project can split work between owners.