Cass Pine
Named in 1 project in the 2025 GA ITS Ten-Year Plan (2026-2035), in Bartow County.
Described as new. The quoted wording calls this substation new. “new 230/25kV networked substation named Cass Pine” — TEAMS 20151, plan p.114
County: “Build a new 230/25kV networked substation named Cass Pine in Bartow County” — TEAMS 20151. The plan itself prints no county column.
Location
Bartow County, GA
County only. A source prints the county; no point is published. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: No point. No sponsor map draws Cass Pine; Georgia Power's Grassy Hollow–Great Valley map prints only Grassy Hollow and Great Valley. Not bounded on a corridor because its other line end, Hill View, has no located point.
Sources: 2025 GA ITS Ten-Year Plan (2026-2035), Southern Company Services; filed by Georgia Power in GA PSC Docket 56002 (2025 Annual Transmission Update, public disclosure) (filed 2026-02-27), p.114 · 2025 GA ITS Ten-Year Plan (2026-2035), Southern Company Services; filed by Georgia Power in GA PSC Docket 56002 (2025 Annual Transmission Update, public disclosure) (filed 2026-02-27), p.121 · Georgia Power, Grassy Hollow–Great Valley 230 kV Transmission Project page (n/a (retrieved 2026-11-20)), About the Project; Project Map. Researched by Substation Scout; checked November 21, 2026.
Projects naming this substation
As the plan prints them. The sponsor is the project’s; one project can split work between owners.
| Project | Sponsor | Where in the plan | Need date | Change from the previous plan | Substations named |
|---|---|---|---|---|---|
| CC - CASS PINE 230/25kV NEW SUB IMPROVEMENTS Build a new 230/25kV networked substation named Cass Pine in Bartow County that will interconnect between new Great Valley and Hill View 230kV substations. TEAMS 20151 · plan p.114 · zone 211 |
GPC | In the plan p.9 |
Dec 31, 2026 | No change | Cass Pine, Great Valley, Hill View |
Generation interconnection requests filed in Bartow, GA: Southern Company queue, 8 active of 17. Same county, not the same substation.
Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.
Before relying on any of this
- The plan prints no county for a substation. A county shown here is printed in the plan beside the station, or on a Georgia Power or Georgia Transmission project page that names the same station and one county.
- Project Sponsor belongs to the project, not to each station; one project can split work between owners.
- Costs are redacted in the public version of the plan and are not shown.