Grassy Hollow
Named in 1 project in the 2025 GA ITS Ten-Year Plan (2026-2035), in Bartow County.
Described as new. The quoted wording describes building this substation, without the word "new". “Build two 230kV switching stations (Hill View and Grassy Hollow)” — TEAMS 20150, plan p.121
County: “the Grassy Hollow–Great Valley 230 kV Transmission Project in Bartow County, which includes construction of a new Grassy Hollow substation” — Georgia Power, Grassy Hollow–Great Valley 230 kV Transmission Project page, retrieved 2026-11-20. The plan itself prints no county column.
Location
34.2449, -84.6749 · Bartow County, GA · view on a map
Point published by the utility. The utility publishes this point, on a project map or in a filing. Accurate to about ±300 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: Printed by the sponsor: Georgia Power's Grassy Hollow–Great Valley project page embeds its project map's configuration, with a point marker titled "Grassy Hollow Substation" at 34.2448811, -84.67487111; the printed 230 kV route (64 vertices) runs from the Great Valley Substation marker and ends 50 m from it. Web-map marker, not a survey: the page says "MAP NOT BASED ON FIELD SURVEY DATA" and "Structure and Line Locations based on Pre-Engineering data and subject to change". ±300 m.
Sources: 2025 GA ITS Ten-Year Plan (2026-2035), Southern Company Services; filed by Georgia Power in GA PSC Docket 56002 (2025 Annual Transmission Update, public disclosure) (filed 2026-02-27), p.121 · Georgia Power, Grassy Hollow–Great Valley 230 kV Transmission Project page (n/a (retrieved 2026-11-20)), About the Project; Project Map · Georgia Power, Grassy Hollow - Great Valley pre-construction postcard (n/a), p. 1 · OpenStreetMap: 230 kV line McGrau Ford - Cartersville area (way 178742241) (OSM base 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.
Projects naming this substation
As the plan prints them. The sponsor is the project’s; one project can split work between owners.
| Project | Sponsor | Where in the plan | Need date | Change from the previous plan | Substations named |
|---|---|---|---|---|---|
| CC - HILL VIEW & GRASSY HOLLOW SUB - IMPROVEMENTS Build two 230kV switching stations (Hill View and Grassy Hollow) looping into the Cartersville - McGrau Ford 230kV line. Build two new 230kV lines: Cass Pine - Great Valley and Great Valley - Grassy Hollow. TEAMS 20150 · plan p.121 · zone 211 |
GPC | In the plan p.10 |
Jun 1, 2027 | Advanced within 2027 | Cartersville, Grassy Hollow, Hill View, McGrau Ford |
Generation interconnection requests filed in Bartow, GA: Southern Company queue, 8 active of 17. Same county, not the same substation.
Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.
Before relying on any of this
- The plan prints no county for a substation. A county shown here is printed in the plan beside the station, or on a Georgia Power or Georgia Transmission project page that names the same station and one county.
- Project Sponsor belongs to the project, not to each station; one project can split work between owners.