Broadway

Named in 3 projects in the 2025 GA ITS Ten-Year Plan (2026-2035).

—county (not printed)
—kV in the quote
GPCproject sponsor
3projects in the plan

The plan prints no county for this substation, and no utility project page found names one for it.

Projects naming this substation

As the plan prints them. The sponsor is the project’s; one project can split work between owners.

ProjectSponsorWhere in the planNeed dateChange from the previous planSubstations named
BROADWAY - ECHECONNEE 115kV LINE RECONDUCTOR
Reconductor the 4.9 miles Griffin Rd to Echeconnee segment of the Broadway - Echeconnee 115kV line with 210C 636 ACCR conductor. Replace the limiting jumper with higher rated jumper.
TEAMS 21047 · plan p.119 · zone 214
GPC In the plan
p.10
Jun 1, 2027 Advanced from 2029 to 2027 Broadway, Echeconnee
BROADWAY-SOUTH MACON 115kV REBUILD
Rebuild 3.7 miles of the Broadway - South Macon 115kV line with 200C 1351 ACSS conductor. Replace limiting elements along the line.
TEAMS 21096 · plan p.233 · zone 214
GPC In the plan
p.17
Jun 1, 2030 New project Broadway, South Macon
BROADWAY - ECHECONNEE 115kV REBUILD
Rebuild the Griffin Rd to Broadway section of the Broadway - Echeconnee 115kV line, approximately 11.5 miles, with 200C 1351 ACSS conductor.
TEAMS 21625 · plan p.232 · zone 214
GPC In the plan
p.17
Jun 1, 2030 New project Broadway, Echeconnee

Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.