Douglasville
Named in 3 projects in the 2025 GA ITS Ten-Year Plan (2026-2035).
—county (not printed)
—kV in the quote
GPC, GTCproject sponsor
3projects in the plan
The plan prints no county for this substation, and no utility project page found names one for it.
Projects naming this substation
As the plan prints them. The sponsor is the project’s; one project can split work between owners.
| Project | Sponsor | Where in the plan | Need date | Change from the previous plan | Substations named |
|---|---|---|---|---|---|
| GTC: DOUGLASVILLE - VILLA RICA 230kV REBUILD (CC NET IMPRVT) Rebuild a 2.5 miles section of the Villa Rica - Douglasville 230kV line with bundled 200C 1351 ACSS Martin conductor. TEAMS 20776 · plan p.127 · zone 201 |
GTC | In the plan p.10 |
Jun 1, 2027 | No change | Douglasville, Villa Rica |
| SMART VALVES AT EAST VILLA RICA SWITCHING STATION Install Advanced Power Flow Controllers at the new East Villa Rica Switching Station on the Douglasville - Villa Rica 230kV and Summer Lake - Villa Rica 230kV lines. TEAMS 21069 · plan p.184 · zone 201 |
GPC | In the plan p.14 |
Jun 1, 2028 | No change | Douglasville, East Villa Rica, Summer Lake, Villa Rica |
| GTC: DOUGLASVILLE - EAST VILLA RICA SS 230kV REBUILD Rebuild 8.2 miles of the Douglasville - East Villa Rica 230kV line with 200C 1351.0 ACSS Martin conductor. TEAMS 21271 · plan p.247 · zone 201 |
GTC | In the plan p.18 |
Jun 1, 2030 | New project | Douglasville, East Villa Rica, EAST VILLA RICA SS |
Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.
Before relying on any of this
- The plan prints no county for a substation. A county shown here is printed in the plan beside the station, or on a Georgia Power or Georgia Transmission project page that names the same station and one county.
- Project Sponsor belongs to the project, not to each station; one project can split work between owners.
- Costs are redacted in the public version of the plan and are not shown.