Big Ogeechee
Named in 1 project in the 2025 GA ITS Ten-Year Plan (2026-2035).
Described as new. The quoted wording calls this substation new. “Construct a new substation near Little Ogeechee” — TEAMS 19966, plan p.105
The project title, "SAV: CC - BIG OGEECHEE 500/230kV (NETWORK IMPROVEMENTS)", names the station; the description builds one new substation. SERTP's 2025 Regional Transmission Plan (p.75) prints "SAV: BIG OGEECHEE 500/230 KV, NEW SUBSTATION, CONSTRUCT".
The plan prints no county for this substation, and no utility project page found names one for it.
Location
Chatham County, GA
County only. A source prints the county; no point is published. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: No point. The plan places it "near Little Ogeechee, adjacent to" the McCall Road - Thalmann 500 kV and Little Ogeechee - Meldrim 230 kV lines, which is an adjacency, not a point; Georgia Power's article has no map, and OSM has no feature named Big Ogeechee.
Note: Possibly complete: Georgia Power's 2026-06-17 article says "This summer in Savannah, Georgia Power will finalize" the project; plan need date 06/01/2026. No in-service date was found.
Sources: 2025 GA ITS Ten-Year Plan (2026-2035), Southern Company Services; filed by Georgia Power in GA PSC Docket 56002 (2025 Annual Transmission Update, public disclosure) (filed 2026-02-27), p.105 · Georgia Power news: Big Ogeechee substation to power Savannah-area growth (2026-06-17) · OpenStreetMap: Little Ogeechee Substation and nearby features (OSM base 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.
Projects naming this substation
As the plan prints them. The sponsor is the project’s; one project can split work between owners.
| Project | Sponsor | Where in the plan | Need date | Change from the previous plan | Substations named |
|---|---|---|---|---|---|
| SAV: CC - BIG OGEECHEE 500/230kV (NETWORK IMPROVEMENTS) Construct a new substation near Little Ogeechee, adjacent to the 500kV and 230kV McCall Road - Thalmann 500kV and the Little Ogeechee - Meldrim 230kV Black and White lines. The new substation will loop in the existing McCall Road - Thalmann 500kV line, the existing Little Ogeechee - Meldrim 230kV lines, and accommodate a new 500/230kV auto transformer with an additional 230kV connection to Little Ogeechee. TEAMS 19966 · plan p.105 · zone 219 |
SAV | In the plan p.8 |
Jun 1, 2026 | No change | Big Ogeechee, Little Ogeechee, McCall Road, Meldrim, Thalmann |
Generation interconnection requests filed in Chatham, GA: Southern Company queue, 1 active of 7. Same county, not the same substation.
Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.
Before relying on any of this
- The plan prints no county for a substation. A county shown here is printed in the plan beside the station, or on a Georgia Power or Georgia Transmission project page that names the same station and one county.
- Project Sponsor belongs to the project, not to each station; one project can split work between owners.
- Costs are redacted in the public version of the plan and are not shown.