Named in 1 project in the 2025 GA ITS Ten-Year Plan (2026-2035).

—county (not printed)
—kV in the quote
SAVproject sponsor
1projects in the plan

Described as new. The quoted wording calls this substation new. “Construct a new substation near Little Ogeechee” — TEAMS 19966, plan p.105

The project title, "SAV: CC - BIG OGEECHEE 500/230kV (NETWORK IMPROVEMENTS)", names the station; the description builds one new substation. SERTP's 2025 Regional Transmission Plan (p.75) prints "SAV: BIG OGEECHEE 500/230 KV, NEW SUBSTATION, CONSTRUCT".

The plan prints no county for this substation, and no utility project page found names one for it.

Location

Chatham County, GA

County only. A source prints the county; no point is published. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

How it was located: No point. The plan places it "near Little Ogeechee, adjacent to" the McCall Road - Thalmann 500 kV and Little Ogeechee - Meldrim 230 kV lines, which is an adjacency, not a point; Georgia Power's article has no map, and OSM has no feature named Big Ogeechee.

Note: Possibly complete: Georgia Power's 2026-06-17 article says "This summer in Savannah, Georgia Power will finalize" the project; plan need date 06/01/2026. No in-service date was found.

Sources: 2025 GA ITS Ten-Year Plan (2026-2035), Southern Company Services; filed by Georgia Power in GA PSC Docket 56002 (2025 Annual Transmission Update, public disclosure) (filed 2026-02-27), p.105 · Georgia Power news: Big Ogeechee substation to power Savannah-area growth (2026-06-17) · OpenStreetMap: Little Ogeechee Substation and nearby features (OSM base 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.

Projects naming this substation

As the plan prints them. The sponsor is the project’s; one project can split work between owners.

ProjectSponsorWhere in the planNeed dateChange from the previous planSubstations named
SAV: CC - BIG OGEECHEE 500/230kV (NETWORK IMPROVEMENTS)
Construct a new substation near Little Ogeechee, adjacent to the 500kV and 230kV McCall Road - Thalmann 500kV and the Little Ogeechee - Meldrim 230kV Black and White lines. The new substation will loop in the existing McCall Road - Thalmann 500kV line, the existing Little Ogeechee - Meldrim 230kV lines, and accommodate a new 500/230kV auto transformer with an additional 230kV connection to Little Ogeechee.
TEAMS 19966 · plan p.105 · zone 219
SAV In the plan
p.8
Jun 1, 2026 No change Big Ogeechee, Little Ogeechee, McCall Road, Meldrim, Thalmann

Generation interconnection requests filed in Chatham, GA: Southern Company queue, 1 active of 7. Same county, not the same substation.

Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.

Before relying on any of this